Porcelain manufacturing lead times: from mould to delivery
"How long will it take?" is often the first question. The answer depends above all on one thing: starting from an existing shape, or creating a new shape with its moulds.
Existing shape
On a shape already in production, the lead time depends mainly on the decoration: artwork approval, decal or glaze, fired trial, then series production.
New shape
A new shape adds the drawing, the model, the master mould, prototypes, their approval and the production moulds.
Approvals
Each approval on your side, drawing, prototype, decorated sample, is part of the lead time: quick feedback shortens the project.
Series production
Casting, drying, firing, glazing and decoration follow one another; the factory schedule and the volume set the release date.
Packing and transport
Packing, palletising and transport to the delivery address add to the manufacturing lead time.
What shortens a project the most?
Starting from an existing shape and approving artwork, prototypes and samples quickly.
When is the lead time set?
At the quotation stage: we build it with you from the target delivery date.
Planning ahead
For a hotel opening, a launch or a season, the schedule is built backwards from the target date; we set it with you from the quotation stage.