Planning a porcelain collection: the stages and a backward schedule
A porcelain collection is prepared well before it reaches the shops. Knowing the stages lets you start from the launch date and work backwards.
The stages
Brief and drawing, model and master mould, prototypes, approval of shapes, colours and decorations, production moulds, manufacturing, decoration, packaging and transport.
What takes time
Approval rounds are often the longest stage. Quick decisions on prototypes and colours shorten the schedule.
Starting from the launch date
A backward schedule starts from the on-sale date and works back: transport, manufacturing, sample approval, prototypes, moulds. Each stage gets a deadline.
Seasonal collections
Christmas and holiday collections are often decided early in the year. For a season, it pays to start development as soon as the collection is set.
An existing shape
Starting from a shape already in production, with a new decoration, removes the mould stage and shortens the schedule considerably.
How long for a new porcelain piece?
Count the stages: design, model, moulds, prototypes, approval, production and shipping. The schedule is built in the quotation from your launch date.
Can it be done faster?
By approving each stage quickly and starting from an existing shape, which avoids the model and moulds.
With us
We draw up the schedule with you at quotation, stage by stage, and keep it updated until delivery.